Province | Subbasin | % |
---|---|---|
Columbia Plateau | Umatilla | 100.00% |
Previous: | Next: |
---|---|
73982 REL 60: 1987-100-01 EXP UMATILLA ANADROMOUS FISH HABITAT - CTUIR |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Effective implementation management and timely contract administration | A: 119. Habitat Project Implementation Management and Contract Administration | 01/31/2021 | 01/28/2021 | |
Compliance documentation and assistance for environmental and cultural resource clearances | B: 165. Environmental Compliance Clearance for ecological restoration and habitat enhancement projects | 01/31/2021 | 01/22/2021 | |
List of final projects | C: 114. CTUIR Umatilla Subbasin Restoration Coordination | 01/31/2021 | 01/28/2021 | |
Coordinate watershed association activities | D: 191. Umatilla River Watershed coordination duties | 01/31/2021 | 01/28/2021 | |
Complete outreach and education activities | E: 99. Public Outreach and Education | 01/31/2021 | 01/28/2021 | |
Provide technical input and summaries to enhance or protect natural resources in the subbasin. | F: 122. Review and provide technical input on issues and topics that affect the area's natural resources | 01/31/2021 | 01/28/2021 | |
Maintain proper operation of instream habitat structures | G: 186. Inspect and maintain function of instream improvement structures | 01/31/2021 | 01/28/2021 | |
Maintenance of habitat features associated with project conservation agreements | H: 186. Maintenance of habitat features associated with project conservation agreements | 01/31/2021 | 01/28/2021 | |
Maximize survival of native vegetation in enhancement project areas. | I: 198. Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas | 01/31/2021 | 01/28/2021 | |
Draft Umatilla River Subbasin Assessment and Action Plan | J: 115. Produce Umatilla River Subbasin Assessment | 01/29/2021 | ||
Meacham Creek RM 10 Habitat Enhancement Design | L: 175. Meacham RM 10 Habitat Enhancement Project Design | 01/31/2021 | ||
100% UmaBirch Floodplain Restoration and Habitat Enhancement Design | M: 175. UmaBirch Properties - Floodplain Restoration and Habitat Enhancement Draft Designs | 01/31/2021 | ||
Create Floodplain Complexity | N: 29. Construction - Bonifer Floodplain Restoration and In-stream Enhancement: PA-1 | 12/31/2020 | 08/06/2020 | |
Completed channel construction | O: 30. Construction - Bonifer Floodplain Restoration and In-stream Enhancement: PA-1 | 12/31/2020 | 08/06/2020 | |
Remove Levees and Spur Dikes | P: 180. Construction - Bonifer Floodplain Restoration and In-stream Enhancement: PA-1 | 12/31/2020 | 08/06/2020 | |
Complete scheduled tree and shrub plantings in project areas | Q: 47. Planting within Umatilla River Subbasin project areas | 01/31/2021 | 12/31/2020 | |
Produce documents and surveys necessary for the conservation easement | U: 172. Conduct pre-aquisition activities for Birch Creek-Umatilla River confluence, UmaBirch Properties | 01/29/2021 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Habitat Project Implementation Management and Contract Administration | |||||||
B | 165 | Environmental Compliance Clearance for ecological restoration and habitat enhancement projects | |||||||
C | 114 | CTUIR Umatilla Subbasin Restoration Coordination | |||||||
D | 191 | Umatilla River Watershed coordination duties | |||||||
E | 99 | Public Outreach and Education | |||||||
F | 122 | Review and provide technical input on issues and topics that affect the area's natural resources | |||||||
G | 186 | Inspect and maintain function of instream improvement structures | 09/10/2020 | ||||||
H | 186 | Maintenance of habitat features associated with project conservation agreements | 09/10/2020 | ||||||
I | 198 | Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas | 09/10/2020 | ||||||
J | 115 | Produce Umatilla River Subbasin Assessment | 08/20/2020 | ||||||
K | 184 | West Birch Creek Fish Passage Project Implementation | |||||||
L | 175 | Meacham RM 10 Habitat Enhancement Project Design | 08/20/2020 | ||||||
M | 175 | UmaBirch Properties - Floodplain Restoration and Habitat Enhancement Draft Designs | 01/12/2021 | ||||||
N | 29 | Construction - Bonifer Floodplain Restoration and In-stream Enhancement: PA-1 | 08/03/2020 | ||||||
O | 30 | Construction - Bonifer Floodplain Restoration and In-stream Enhancement: PA-1 | 08/03/2020 | ||||||
P | 180 | Construction - Bonifer Floodplain Restoration and In-stream Enhancement: PA-1 | 08/03/2020 | ||||||
Q | 47 | Planting within Umatilla River Subbasin project areas | 08/03/2020 | ||||||
R | 29 | Construction - East Birch Creek Floodplain Reconnection | |||||||
S | 30 | Construction - East Birch Creek Floodplain Reconnection | |||||||
T | 180 | Construction - East Birch Creek Floodplain Reconnection | |||||||
U | 172 | Conduct pre-aquisition activities for Birch Creek-Umatilla River confluence, UmaBirch Properties | |||||||
V | 185 | Periodic Status Reports for BPA | |||||||
W | 132 | [Deliverable due next period] Progress Report (2-year): Calendar-year 2019 and 2020 (01/01/2019 - 12/31/2020) |